2021.9
The "first pile" of Hunan HGA was laid on the construction site, which opened the major prelude of the project construction.

400-811-8871

Copyright Zhejiang Hangjiazetong Building Energy Saving New Materials Co., Ltd. powered by www.300.cn
The "first pile" of Hunan HGA was laid on the construction site, which opened the major prelude of the project construction.
400-811-8871
Copyright Zhejiang Hangjiazetong Building Energy Saving New Materials Co., Ltd. powered by www.300.cn